Project Breief:
The Metro Line 3 in Egypt is a major addition to the Cairo Metro network, designed to connect the eastern and western parts of Greater Cairo. It plays a crucial role in reducing traffic congestion and providing a fast, reliable, and affordable mode of transportation.
Route: Line 3 runs from Cairo International Airport (east) to Imbaba and Rod El-Farag (west), passing through central Cairo.
The total planned length is approximately 41.2 kilometers, with 34 stations (both underground and elevated).
GLC Lighting Items Supplied:
Downlights , Batten, Tri Proof and 60x60 Panel.